Commit graph

2 commits

Author SHA1 Message Date
Randall Stillwell
ac91d73a34 convoy: flip visual-diff to a hard merge gate (harden-visual-diff-gate brief 2/2)
Removes `continue-on-error: true` from `.github/workflows/visual-diff.yml`'s
`Capture screenshots (PR)` step. Visual drift is now a real merge gate
on UI-touching PRs.

Brief 2/2 of the `harden-visual-diff-gate` convoy. PR #138 shipped the
seed workflow (Brief 1); PR #139 (`54495fe`) landed the fresh Linux
baseline regenerated against post-glass-redesign main on CT 111. With a
known-good baseline committed, the gate can flip without false-failing
every UI-touching PR.

## What changes

- `.github/workflows/visual-diff.yml` — drop the
  `continue-on-error: true` flag; add an inline rationale block linking
  to the convoy + the operator runbook for both intentional changes
  (dispatch seed workflow → manually open PR → merge → re-run) and
  unintentional regressions (inspect artifact diff → fix → push).
- `.github/workflows/ci.yml` — add 9th `forbidden-patterns` check that
  greps `visual-diff.yml` for `^\s*continue-on-error:\s*true` and fails
  the build if it returns. Risk #3 of the convoy made concrete: prevents
  silent re-introduction via template revert. Scoped narrowly to that
  one file; other workflows (`seed-visual-baselines.yml`'s PR-open
  step, etc.) legitimately use the flag. Job name bumped from
  "Forbidden patterns (8 checks)" → "(9 checks)". All `Check N/8`
  group labels renumbered to `N/9`.
- `AGENTS.md` — § Testing § Visual baselines rewritten to drop the
  "Known staleness as of 2026-06-12" callout (resolved by PR #139);
  § Testing § Screenshot diff rewritten to lead with "hard merge gate",
  document the intentional-change runbook, reference the new ci.yml
  check, and explicitly mention the org-setting caveat for the seed
  workflow's auto-PR step.
- `tests/visual/homepage.spec.ts` — module docblock rewritten to match
  the AGENTS.md runbook: drops the "advisory, not gating" language;
  promotes the seed-visual-baselines workflow as the primary
  re-seeding path; demotes the Playwright Docker image to the offline
  fallback.
- `.github/workflows/seed-visual-baselines.yml` — patches the
  `peter-evans/create-pull-request@v6` PR-open failure case discovered
  during Brief 1's first dispatch (run 27454132468). The PR-open step
  is now `continue-on-error: true` (narrowly scoped, with an inline
  rationale callout distinguishing it from the just-removed
  `visual-diff.yml` flag — that one silently hid real UI regressions;
  this one fronts a known org-level "Allow GitHub Actions to create
  and approve pull requests" limitation with a loud failure notice).
  New steps disambiguate the three possible outcomes (no-changes /
  pr-opened / branch-pushed-pr-blocked) via a `git ls-remote` check on
  the bot branch and exit non-zero on the blocked-PR case so the
  workflow run shows red and the operator gets the exact `gh pr create`
  command in the run logs.
- `.convoys/harden-visual-diff-gate.md` — status: shipping; Step 2
  marked SHIPPED; Decision D4 ratified (chose option C: accept org
  setting, document manual `gh pr create` fallback). Inline links to
  PR #139 + PR #140.

## Test plan

- [x] `npm run lint` — clean (1 pre-existing unrelated warning)
- [x] `npm run test:run` — 24 files / 118 tests pass
- [ ] CI on this PR: 9th forbidden-patterns check passes; visual-diff
  job passes against the fresh baseline; convoy-metrics-gate passes
  (2 new rows added by this commit)
- [ ] After merge: smoke test the 9th check by opening a throwaway PR
  that re-adds `continue-on-error: true` to `visual-diff.yml`; confirm
  it red-X's. (Skip if confident in the grep.)

## Convoy state

- Brief 1: SHIPPED (PR #138, `c100c5f`, 2026-06-13)
- Baseline refresh: SHIPPED (PR #139, `54495fe`, 2026-06-13)
- Brief 2 (this PR): shipping
- Convoy closeout: this PR's merge

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-06-12 21:58:54 -05:00
varutasu
c100c5f192
convoy: add seed-visual-baselines workflow (harden-visual-diff-gate brief 1) (#138)
Adds a workflow_dispatch-triggered job on the self-hosted axiom runner
that captures fresh `tests/visual/__screenshots__/*.png` against a
caller-provided URL and opens a `chore(visual): refresh baselines from
<url>` PR via peter-evans/create-pull-request@v6.

This is brief 1 of 2 of the harden-visual-diff-gate convoy. The
workflow exists but is not invoked by this PR — operator dispatches via
the GitHub UI or `gh workflow run seed-visual-baselines.yml` once they
want a fresh baseline against post-glass-redesign main.

Brief 2 (flip continue-on-error: true off visual-diff.yml, add 9th
forbidden-patterns check) is unblocked once a fresh baseline lands via
this workflow's auto-PR.

Convoy decision D1 ratified: Option B (workflow_dispatch + auto-PR)
chosen over Option A (ad-hoc SSH-into-CT-111 + manual commit). The
workflow gives the baseline regeneration a reviewable Git-native shape;
the auto-PR carries a checklist for visual sanity-check before merge.

Workflow shape:
- Inputs: base_url (required, no default to avoid wrong-target
  accidents), reason (optional, used in PR body).
- Permissions: contents: write + pull-requests: write — sufficient for
  default GITHUB_TOKEN; no PAT needed.
- Caches: shares the node_modules + Playwright browser caches with
  visual-diff.yml so the byte-equivalence guarantee holds without
  cache miss overhead.
- Idempotent: peter-evans/create-pull-request short-circuits to a
  ::notice:: annotation if the captures match the existing committed
  baselines (no PR opened).

Metrics: logged role-conductor + role-architect + role-implementer
events for this convoy in .convoys/.metrics.jsonl. Satisfies the
convoy-metrics-gate (PR #134, 9eef8d9) that fires on convoy:-titled
PRs requiring at least one new metrics row.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-06-12 21:37:50 -05:00